Posted inProducts & Services

BGP completes seismic survey for Saudi Aramco

BGP crew 8615 have completed 50,000km survey contract in Saudi Arabia

A BGP crew has completed a challenging 2D seismic acquisition survey for Saudi Aramco in KSA.

In the 48 months since the commencement of the S54 seismic survey in February 2007, more than fifty thousand kilometers of 2D data have been acquired by BGP in Saudi Arabia. The work area was located in the desert and far away from the city, which made the logistical support to be extremely difficult. The most challenging issues are the complex terrain and dramatic changes of elevation, which greatly increased operational difficulty.

“The effort of all members of Crew 8615, along with the support of BGP headquarters, enabled them to overcome many difficulties during the operation. The crew reached more than six million man-hours without an LTI. Outstanding performance in difficult terrain as well as a commitment to client satisfaction guaranteed BGP’s success in this operation,” the company said in a statement.

 

Staff Writer

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and...