Energean has announced that its 100% subsidiary, Energean Israel, has signed a contract with Stena Drilling for its 2022 – 2023 growth drilling programme offshore Israel, which is expected to target the derisking of unrisked prospective recoverable resources of over 1 billion barrels of oil equivalent (‘boe’).
The contract is for the drilling of three firm wells and two optional wells, with the first firm well expected to spud in 1Q 2022. The firm wells are all expected to be drilled during 2022.
They consist of the Karish North development well, a key part of the Karish North development. The scope includes re-entry, sidetracking and completion of the previously drilled Karish North well and completion as a producer. The Karish North development will commercialise 33 Bcm (1.2 Tcf) of gas plus 31 mmbbls of liquids 2P reserves (a total of 243 mmboe) and is expected to deliver first gas in 2H 2023.
The other firm well is the Karish Main-04 appraisal well, which is expected to target further prospective volumes within the Karish Main Block, including the potential oil rim that was identified as part of the KM-03 development well drilling. Total unrisked recoverable volumes estimated to be targeted by the well are 166 mmboe.
The Athena exploration well, located in Block 12, is situated directly between the Karish and Tanin leases.
Athena is estimated to contain unrisked recoverable prospective resource volumes of 20 Bcm (0.7 Tcf) of gas plus 4 mmbbls of liquids1; of which the primary target is estimated to contain unrisked recoverable prospective resource volumes of 10 Bcm (0.4 Tcf) of gas plus 2 mmbbls of liquids1 with a 70% geological chance of success.
Success at Athena would be expected to significantly de-risk approximately 90 Bcm (2.5 Tcf) plus 19 mmbbls1 of remaining unrisked recoverable prospective resource volumes located within Block 12 and Tanin.
Two factors support the commercialisation of a Block 12 discovery. Firstly, Block 12 was a new licence award to Energean Israel Limited in 2018; produced volumes will therefore generate no royalty payments in respect of Energean Israel Limited’s original acquisition of the block. Secondly, the more proximate location of the potential development to the expected location of the Energean Power FPSO is also expected to reduce like-for-like development costs when compared with Tanin.
The drilling campaign will be undertaken using the Stena Icemax drillship, a state-of-the-art ice-class harsh environment dual-activity dynamically positioned drillship, capable of drilling in water depths of up to 10,000 ft.